Integrated Project Delivery Archives - HCO News https://hconews.com/tag/integrated_project_delivery/ Healthcare Construction & Operations Tue, 14 May 2019 20:25:01 +0000 en-US hourly 1 https://wordpress.org/?v=6.0.9 https://hconews.com/wp-content/uploads/2024/07/cropped-HCO-News-Logo-32x32.png Integrated Project Delivery Archives - HCO News https://hconews.com/tag/integrated_project_delivery/ 32 32 Saint Thomas Rutherford Hospital Begins Large Expansion https://hconews.com/2019/01/17/saint-thomas-rutherford-hospital-begins-large-expansion/ Thu, 17 Jan 2019 14:52:00 +0000 http://hconews.com/?p=44528 By Roxanne Squires MURFREESBORO, Tenn. — Turner Construction Company recently announced that work on a $48 million, 95,623-square-foot vertical expansion

The post Saint Thomas Rutherford Hospital Begins Large Expansion appeared first on HCO News.

]]>
By Roxanne Squires

MURFREESBORO, Tenn. — Turner Construction Company recently announced that work on a $48 million, 95,623-square-foot vertical expansion of Saint Thomas Rutherford Hospital in Murfreesboro has commenced.

The plan is to build three floors vertically onto the existing structure, which will be able to house 72 medical-surgical patient rooms along with one floor for possible buildout in the future. Additionally, a two-story horizontal expansion will add on four operation rooms, central sterile space and materials management.

In 2010, Turner Construction completed work on the original 286-bed Saint Thomas Rutherford hospital while putting provisions in place at the time to mitigate any utility interruptions during the future expansion.

The team executed the original project under integrated project delivery (IPD), aiding them in completing the project two months ahead of schedule and also saving $4 million.

Largely, these projects are part of a greater expansion plan to meet the long-term needs of the growing Rutherford County population.

Currently, Turner Construction has been collaborating with Nashville-based Gresham Smith, the handler of the architectural and engineering work, to allow the hospital to remain operational during construction of the new expansion.

To ensure this, Turner worked closely with Gresham Smith to take every possible measure during construction to reduce the impact it has on the hospital’s existing space. Moreover, Turner scheduled the project in order for work within the existing medical-surgical wings below the expansion will take place during a low volume periods for the hospital.

To achieve minimizing noise and disruption, electric cranes are being used for the project, and all construction personnel will access the work area from a bulk hoist along with not being permitted to enter through the hospital.

“The safety and comfort of our patients is our primary concern, so we were pleased by the extensive amount of planning on Turner’s part to ensure that this project will allow Saint Thomas Rutherford to continue providing unimpeded service to patients throughout,” said Gordon Ferguson, president and CEO of Saint Thomas Rutherford. “We look forward to our increased capacity to provide medical care to our community once this expansion is complete.”

The 52,000-square-foot, three-floor addition to the west patient tower will increase their capacity to 358-beds, improving patient flow and providing additional space for all patient services.

Process efficiency will be reflected in the layouts by utilizing flexible nurse stations, which will create an adaptable space for clinical needs and staff collaboration while promoting safety.

Large windows will flood the space with natural light, creating a healing environment that influence positive patient outcomes.

Turner Construction is also currently working on similar vertical expansion and overbuild work at three actively operating hospitals in Tennessee: Monroe Carell Jr. Children’s Hospital at Vanderbilt in Nashville and Methodist University Hospital and Le Bonheur Children’s Hospital in Memphis.

“We’re excited about the opportunity to continue working with Saint Thomas Health, a leader in our community that has been a great partner to us over the years,” said Paul Lawson, project executive for Turner Nashville. “It’s an honor to continue to be a part of this organization’s mission to provide high-quality health care to its community.”

Substantial completion is slated for April 2020 for the expansion of Saint Thomas Rutherford’s tower and operating room unit, along with the new space expected to open in summer 2020. 

The post Saint Thomas Rutherford Hospital Begins Large Expansion appeared first on HCO News.

]]>
Chambersburg Hospital Addition Set for Summer Completion https://hconews.com/2012/02/01/chambersburg-hospital-addition-set-summer-completion/ ST. LOUIS — A new $72 million four-level addition is scheduled for summer completion at Chambersburg Hospital, an affiliate of Summit Health located in Chambersburg, Pa.

The new tower will include 174,000 square feet of new construction and 4,100 square feet of renovated space.

The post Chambersburg Hospital Addition Set for Summer Completion appeared first on HCO News.

]]>
ST. LOUIS — A new $72 million four-level addition is scheduled for summer completion at Chambersburg Hospital, an affiliate of Summit Health located in Chambersburg, Pa.

The new tower will include 174,000 square feet of new construction and 4,100 square feet of renovated space.

The addition will house 171 all-private patient rooms, a new cardiology and catheterization area, a new dialysis unit and a central utility plant.

The new private rooms will provide patients with a “quieter, more restful atmosphere” to help patients heal, said Norm Epstein, president and CEO of Chambersburg Hospital.

Architecture, engineering, construction services and site work will be provided by St. Louis, Mo.-based design and build firm HBE Corp.

“HBE enabled Chambersburg Hospital to achieve a superior design with larger private rooms and improved operational efficiencies while maintaining the quality specifications we require,” Epstein said. “HBE’s superior design and guaranteed lump sum price will help facilitate the execution of our 10-year facility plan via tremendous cost savings on our largest and most strategic project.”

The firm began construction on the addition in 2012, and expects it to complete in September 2012.

The post Chambersburg Hospital Addition Set for Summer Completion appeared first on HCO News.

]]>